News
The Installation of Mixing Tower
For every Asphalt Mixing Plant, install of mixing tower is always a critical process, and certain capacity hoist or crane is required inevitably.
A Scar on the Asphalt Plant
Maintenance of asphalt mixing plant is seemingly a tough work sometimes, for a new case that due to the moisture of raw filler from customer size.
38 seconds for a fully mixing cycle for one batch!
For asphalt mixing plant, as everyone know that one batch of asphalt mixture takes 45 seconds for a cycle before next batches, as one of engineers in Guangzhou just now told us that it takes 38 seconds to finish one batch mixing!
Why do Customers Choose us?
One of Xitong Customer has two Apshalt Plants, one is from germany and another from us, when the road paving work is busy, this customer I more willing to use our equipment rather than foreign equipment.
Navigation
Contact Us
+86 510 8536 3108 ext 8309
+86 138 6172 8715
+86 510 8536 1108
398521344@qq.com
No.88 Xuedian South Road, Shuofang Town, Xinwu District. Wuxi, Jiangsu, China
Follow Us